Monday, 3 March 2014






Right now Potato is going to Azerbaijaan, Taftaan Iran

Dubai have good rates

Kelang Malaysia it is going in Mesh bag

Before 02 months it was immature skin and was dispatched in Jute bags of 14kg

But now going in Mesh bag

Red Mesh bag for Malaysia, Dubai

Yellow Mesh bag for Taftaan, Azerbaijaan, Colombo


















Payment terms 100% advance or
30/60/90 Days L/C

Acceptance required on invoice and B/L to be on board in 15-25 days
after acceptance received and done by Issuing bank of Deferred or USANCE L/C

Loading and shipment would be started after 10 days

At the end of the day or maturity date of Deferred or Usance L/C

USANCE L/C Called or Released as Per Demand Note of Issuing Bank & Advising Bank

Between Seller/Shipper & Consignee/Importer/Buyer

as per agreement, either it would be called or released

For onion, For chicken feets, For meat frozen, chilled, for sea food
Same payment terms we have

No comments:

Post a Comment